EasyManua.ls Logo

Haas VF Series

Haas VF Series
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-15-96 96-8100
HAAS AUTOMATION, INC.
47
MECHANICAL SERVICE
SERVICE
MANUAL
VF-SERIES
3. Go to PARAMETERS page of CRT and ensure PRE-CHARGE DELAY is set to 200. If not, do so at this time.
4. Execute a tool change. A banging noise will be heard as the tool release piston contacts the drawbar.
5. Turn the air pressure regulator ½ turn in. Execute a tool change and listen for the noise described previously. If it is
heard, repeat this step until no noise is heard. There should be no noise with or without a tool in the spindle.
CAUTION! Only increase the pressure to the point where tool changes become obviously quiet. Any further pressure
increases are not beneficial. Excessive pressure to the pre-charge system will cause damage to the tool changer and
tooling in the machine.

Table of Contents

Other manuals for Haas VF Series

Related product manuals