EasyManua.ls Logo

Hillstone SG-6000 X-Series - Page 164

Hillstone SG-6000 X-Series
233 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Use rack-mounting ear to mark the positions of floating nuts on the front rack posts.
3. Attach rack-mounting ears to the left and right side panels of the chassis respectively.
4. Load the chassis steadily on the center of the lift platform.
5. Use the lift to move the chassis to the rack or the cabinet tray, and then move away the lift.
6. Install a mounting screw into each of the two aligned holes as shown below. Use a cross
screwdriver to tighten the screws.
149
Chapter 3 Installation

Table of Contents

Other manuals for Hillstone SG-6000 X-Series