Introduction 118
Installation Site Environment Requirements 118
Temperature/Humidity Requirements 118
Clearness Requirements 119
ESD Prevention 119
EMI Prevention 119
Grounding Requirements 120
Cabinet Requirements 120
Cabinet Size and Clearance Requirements 120
Cabinet Airflow Requirements 120
Rack Requirements 121
Rack Size and Strength 121
Rack Clearance Requirement 121
Rack Mounting Requirements 122
Unpacking 122
Unpacking the Package of SG-6000-X10800 122
Unpacking the Package of SG-6000-X9180/X8180/X7180/X6180/X6150 129
Other Safety Recommendations 132
Verifying the Parts Received 132
Verifying the Parts Received 132
Installation Devices/Tools/Cables 132
TOC - 7