Contents
ii
Install the 9459 Battery Pack ....................................................39
Charge the 9459 Battery Pack ..................................................40
3.2 Connecting the AC Adapter ....................................... 41
3.3 Connecting the Voltage Cords .................................. 42
3.4 Connecting Clamp Sensors ....................................... 44
3.5 Turning the Power On and Off ................................... 46
3.6 Other Preparations .................................................... 48
Select the screen color scheme to match the input terminal
labels ........................................................................................48
Select the naming convention to be applied to each phase
line measurement on the display ..............................................49
3.7 Auxiliary Function (KEY LOCK) ................................. 51
3.8 Auxiliary Function (Save screen image) ................... 52
Chapter 4
Pre-Measurement and System Settings ___ 53
4.1 Basic Setup (Typical Settings) ................................... 54
4.2 Selecting the Measurement Method
(SYSTEM Screen)[MEASURE] ................................. 57
Selecting the Line Frequency (Frequency) ...............................58
Setting the Wiring Method (Wiring) ...........................................58
Setting the Line Voltage (Nominal Line Voltage) of the Lines to
be Measured .............................................................................59
Selecting the Clamp Sensor Model and Current Range ...........60
Setting the PT Ratio (when measuring using a transformer) ....61
Setting the CT Ratio (when measuring using a transformer) ....61
Selecting the Voltage Harmonic Calculation Method ................62
Selecting the Power Factor Calculation Method (PF Type) ......62
4.3 Setting the Recording Method [REC&EVENT] .......... 63
Setting the Method for Recording to Internal Memory (Partition) 63
Setting the Recording Interval (Interval) ...................................64
Setting Demand Period .............................................................65
Setting Recording Start and Stop Times ..................................66
4.4 Setting Event Detection [REC&EVENT] .................... 67
Start Event/ Stop Event ...........................................................68
Manual Events ..........................................................................68
Setting Timed Events ................................................................ 69
Setting Inrush Events ................................................................69
Setting Transient Events ........................................................... 70
Setting Voltage Swell, Dip and Interruption Events ..................71