EasyManua.ls Logo

Hioki 3197 - Chapter 5 Making Connections and Starting & Stopping Measurement; Pre-Operation Inspection

Hioki 3197
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.1 Pre-Operation Inspection
79
5
Before recording, be sure to read "Operating Precautions" (p. 7) and
"Chapter 3 Measurement Preparations" (p. 37)
Making Connections and
Starting & Stopping
Measurement Chapter 5
5.1 Pre-Operation Inspection
Do not use if damage is present, as
you could receive an electric
shock. Replace the damaged items.
If damage is evident, request re-
pairs.
Metal Exposed
Inspect the Voltage Cords
Yes
1
No Metal Exposed
No
Inspection before conection
Inspect the Clamp Sensors
Is a clamp cracked or damaged?
Is the insulation of the voltage cord to
be used damaged, or is bare metal ex-
posed?
No
Inspect the Power Supply
Is the AC adapter or battery pack
damaged?
Yes
No
Inspect the Instrument
Is there any evidence of damage to
the instrument?
Yes
If damage is evident, request re-
pairs.
Before using the instrument the first time, verify that it operates normally to ensure that
the no damage occurred during storage or shipping. If you find any damage, contact
your dealer or Hioki representative.

Table of Contents

Other manuals for Hioki 3197

Related product manuals