EasyManua.ls Logo

NSK EDD Megatorque Motor - Page 228

NSK EDD Megatorque Motor
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. More Advanced Function
8-44
Signal timing
The figure below illustrates signal timing of this positioning operation.
Fig 8-25: Signal timing for automatic program execution at the power-on.
Operation sequence
Max. 3.2 s
closed
open
closed
open
Ouput NRM
Output SVST
Max. 0.5 ms
closed
open
Output BUSY
closed
open
Output IPOS
(FW < 0: CFIN)
TI3200.0
IQ1
IQ1
TI1000.0
TI1000.0
1 s
ON
OFF
Power
ON
OFF
Input HLD
Approximately 3 seconds
1 s
3.2 s
After confirmation of NRM state, start the program automatically.
In HLD state
1)
2)
3)
4)
1) Confirm that the input HLD is OFF. (The input HLD is effective as the contact polarity is
normally closed.)
2) Turn on the main and the control power.
3) When the time for initialization of the CPU elapses, the output NRM is settled and the channel
program 0 starts automatically.
At this moment, the System is in the HOLD state, thus holding the execution of commands in
the program. However the port of output BUSY (In-operation) is closed.
4) Activate the input HLD to cancel the holding state.
After waiting time of 3.2 seconds, the System repeats a motion of 90-angle degrees with one
second pausing time between.
Turn the input HOLD off when temporally stopping the operation.

Table of Contents

Related product manuals