Section 10 Transferring Data 10-3 Data Transfer Using SPMA
NS-Designer Operation Manual
10. Set the Network Address between the PT and PLC (the value set in the local network table using
CX-Net). Here, 3 is set as the Network Address for Ethernet communications.
11. Set the Node Address of the destination PT for the Node Address. Here, the node address of the
PT is input. Here, 22 is set as an example.
12. Click the OK Button in the Ethernet Setting Dialog Box.
13. Click the OK Button in the Comms Method Dialog Box.
Transferring Screen Data
1. Click the Connect button in the Screen Data Transfer Dialog Box. After completing the connection,
the window will switch to the following window. Here, the entire project will be transferred as an
example.
2. Select Select All, and click the button to display the Transfer Confirmation Dialog Box.
3. Click the Start Button. The download will be started.
4. The following dialog box will be displayed at the computer when the data transfer is finished. The
PT must be restarted to operate the screens that have been transferred. Click the YES Button to
restart the PT. Click the NO Button to continue downloading data.
Even if the NO Button is selected, the confirmation message shown below will be displayed when
10-43