Data Management
R&S
®
ESW
298User Manual 1177.6298.02 ─ 08
Remote command: 
Query available templates: HCOPy:TREPort:ITEM:TEMPlate:CATalog?
on page 613
Save template: HCOPy:TREPort:ITEM:TEMPlate:SAVE on page 613
Load template: HCOPy:TREPort:ITEM:TEMPlate:LOAD on page 613
Default template: HCOPy:TREPort:ITEM:DEFault on page 607
12.8.2  Creating a Test Report
Access:   > "Preview"
Generating report data
●
Create a new dataset of the selected measurement channel from scratch: 
(Existing datasets will be deleted.)
●
Append a new dataset of the selected measurement channel to an existing data-
set: 
Test report limitations
The size of the test report is limited to 50.000 measurement points per trace.
If the number of measurement points is greater than that value, only the first 50.000
values are written to the report. The rest is dismissed.
Try to do an ASCII file export when you have more measurement points.
Configuration and printout of the test report................................................................298
Adding and removing datasets....................................................................................299
Configuration and printout of the test report
You can save the test report either as a pdf document or an doc document in the cor-
responding dropdown menu in the "Report Content" dialog box.
Working with Test Reports