Specifying the setpoint via the fieldbus
Interconnecting the fieldbus with the main setpoint
Image 6-22 Fieldbus as setpoint source
Most standard telegrams receive the speed setpoint as a second process data PZD2.
Table 6- 20 Setting the fieldbus as setpoint source
Parameter
Remark
p1070 = 2050[1]
Main setpoint
Interconnect the main setpoint with process data PZD2 from the fieldbus.
p1075 = 2050[1]
Additional setpoint
Interconnect the additional setpoint with process data PZD2 from the fieldbus.