Commissioning
5.4 Quick commissioning with a PC.
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
147
5.4
Quick commissioning with a PC.
The screen forms that are shown in this manual show generally valid examples. The number
of setting options available in screen forms depends on the particular inverter type.
Requirements
To be able to perform quick commissioning using a PC, you need to do the following:
1. Creating a project
2. Integrating the inverter into the project
3. Go online and start the quick commissioning
5.4.1
Creating a project
Creating a new project
Procedure
To create a new project, proceed as follows:
1. In the menu, select "Project" → "New…".
2. Specify a name of your choice for the project.
You have created a new project.
5.4.2
Transfer inverters connected via USB into the project
Integrating the inverter into the project
Procedure
Proceed as follows to transfer an inverter connected via USB to your project:
1. Switch on the inverter supply voltage.
2. First insert a USB cable into your PC and then into the inverter.
3. The PC operating system installs the USB driver when you are connecting the inverter
and PC together for the first time.
Windows 7 installs the driver automatically.
For Windows XP you must acknowledge several system messages.
4. Start the commissioning software.