EasyManua.ls Logo

Siemens CU240B-2 - Laying EMC-Compliant Cables

Siemens CU240B-2
518 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing
4.2 Connecting inverters in compliance with EMC
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
57
4.2.3
Laying EMC-compliant cables
Rules for cable installation to ensure EMC
● Use shielded cables for the following connections:
– Motor and motor temperature sensor
– Braking resistor (not available for all inverters)
– Fieldbus
– Inputs and outputs of the terminal strip
● Lay the cable shields with the largest possible surface at both ends:
Examples for EMC-compliant shield connection follow:

Table of Contents