Commissioning
5.3 Quick commissioning using the BOP-2 operator panel
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
131
5.3
Quick commissioning using the BOP-2 operator panel
5.3.1
Inserting the BOP-2
Plugging on an operator panel
Procedure
To plug an Operator Panel on the Control Unit, proceed as follows:
1.
Locate the lower edge of the Operator Panel into the matching recess
of the Control Unit.
2.
Press the Operator Panel onto the inverter until you hear the latching
mechanism engage.
You have plugged an operator panel onto the Control Unit.
The operator panel is ready for operation when you connect the inverter to the power supply.