A.7 Acceptance tests for the safety functions
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
505
File name of the acceptance reports
… …
Countersignatures
Commissioning engineer
This confirms that the tests and checks have been carried out properly.
This confirms that the settings recorded above are correct.