Installing
4.4 Installing Power Modules
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
67
Depth with Control Unit and Operator Panel
with Control Unit:
With Control Unit and blanking cover / BOP-2:
With Control Unit and IOP:
Table 4- 6 Drilling dimensions, cooling clearances and fixing
Cooling air clearances (mm)