Commissioning
6.2 Requirements
M200D PROFIBUS/PROFINET
136 Manual, 08/2014, A5E01577426A/RS-AA/004
Requirements
Software requirements
Configuration software used
Configuring software for the
master/controller used
See the manual of the master/controller
Configuring software
Motor Starter ES
(optional accessories)
Order No.: 3ZS1310-6CC10-0YA5
For parameterizing, operating and monitoring using a local
device interface or fieldbus interface
(See online help of Motor Starter ES)
Commissioning requirements
For more information, see ...
1. Motor starter and communication module
mounted and connected
Chapter Mounting/connection
2. PROFIBUS address set on the motor starter (on
PROFIBUS only)
Chapter Mounting (Page 100)
3. Supply voltage for motor starter switched on
4. Supply voltage for load switched on (if
necessary)
Motor manual
5. Motor starter configured (configured and
parameterized)
Chapter Configuration/parameterization
(Page 119)
6. Assign device name for motor starter
(on PROFINET only)
Chapter Configuration (Page 123)
7. Supply voltage for master/controller switched on Manual for master/controller
8. Master/controller is switched to RUN mode Manual for master/controller