EasyManua.ls Logo

Siemens SITRANS LUT400 - Page 194

Siemens SITRANS LUT400
330 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SITRANS LUT400
192 Operating Instructions, 07/2019, A5E33329501-AC
Peak 5 End Time (2.7.2.2.12.)
Sets the end time of the high energy cost period 5.
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, for example: for 5:30pm, set parameter to 17:30)
Default: 00:00
Used in conjunction with Peak 5 Start Time (2.7.2.2.11.) (Page 191) to define the high cost
period.
Peak ON Setpoint Pump 1 (2.7.2.2.13.)
Sets the process point at which Pump 1 will turn on when in a peak period.
Values
Range: 0.000 to 99999.000
Default:
0.000
To allow the level to go beyond the normal Relay ON Setpoint before a pump is started,
enter the value to be used for the high-energy cost period.
Peak OFF Setpoint Pump 1 (2.7.2.2.14.)
Sets the process point at which Pump 1 will turn off when in a peak period.
Values
Range: 0.000 to 99999.000
Default: 0.000
To stop the pump(s) before the normal relay OFF Setpoint and reduce pump-running time.
Enter the value to be used for the high cost period.
Peak ON Setpoint Pump 2 (2.7.2.2.15.)
Sets the process point at which Pump 2 will turn on when in a peak period.
Values
Range: 0.000 to 99999.000
Default: 0.000
To allow the level to go beyond the normal Relay ON Setpoint before a pump is started,
enter the value to be used for the high-energy cost period.
Peak OFF Setpoint Pump 2 (2.7.2.2.16.)
Sets the process point at which Pump 2 will turn off when in a peak period.
Values
Range: 0.000 to 99999.000
Default: 0.000
To stop the pump(s) before the normal relay OFF Setpoint and reduce pump-running time.
Enter the value to be used for the high cost period.

Table of Contents

Other manuals for Siemens SITRANS LUT400

Related product manuals