EasyManua.ls Logo

Suzuki RM-Z250 - Page 148

Suzuki RM-Z250
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KICK STARTER 8-7
Install the kick starter lever onto the kick starter shaft.
NOTE:
When installing the kick starter lever, align the wide spline teeth
G and
H.
Tighten the kick starter lever bolt to the specified torque.
# Kick starter lever bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Install the brake pedal. (!16-18)
Connect the radiator hose. (!19-23)
INSPECTION AFTER INSTALLATION
Engine oil level and oil leakage (!2-11)
Engine coolant level and coolant leakage (!2-15, -16)
Smooth movement of kick starter

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals