Chapter 1
8
UM10372_PCNC440_Manual_0221A
PREFACE
Table of Contents
1. Overview 19
1.1 Specicaons 20
2. Site Planning and Prep 21
2.1 General Site Requirements 21
2.1.1 Space Requirements 21
2.2 Electrical Requirements 22
2.2.1 Grounding 22
2.2.2 Plug Paern 22
2.2.3 Ground Fault Interrupter (GFI) Use 22
2.2.4 Electrical Noise 23
2.2.5 Opons for Electrically Non-conforming Sites 23
3. Installaon 24
3.1 Receiving, Uncrang, and Inial Inspecon 24
3.1.1 Shipment Arrival 24
3.1.2 Moving the Crate 24
3.1.3 Inial Uncrang 25
3.1.4 Shipping Damage or Shortages 25
3.2 Installaon Sequence 25
3.3 Basic Installaon Procedure 25
3.3.1 Stand Assembly 25
3.3.2 Remove Pallet Items 26
3.3.3 Li and Move Mill 26
3.3.3.1 Remove Mill from Pallet 26
3.3.3.2 Li Mill 26
3.3.4 Aach Mill to Stand 27
3.3.4.1 Non-Tormach Stands 27