Chapter 3
24
UM10350_PCNC770_Manual_0916A
Installation
3. Installation
This chapter covers basic installaon of a PCNC mill, which takes approximately
half a day. This esmate does not include oponal accessories like enclosures,
power drawbars, or automac tool changers (ATC).
Scan the QR code (at right) to view a list of related technical documentaon,
operator manuals, and support videos: hp://www.torma.ch/install
Recommended for Installaon
• Gloves • 4 mm Hex Wrench (included)
• Eye Protecon • Pallet Jack
• Pry Bar • Engine Hoist
• Strap Snips • Socket Set
• Screwdriver (included) • Liing Bar Kit
3.1 Receiving, Uncrating, and Initial Inspection
WARNING! Transport and Li Hazard: The transport, liing, and moving of mill should be done by
qualied professionals. Failure to do so may result in mill damage, serious injury or death.
3.1.1 Shipment Arrival
Depending on products and opons ordered,
the PCNC system arrives in one or more
shipments:
• PCNC mill (freight)
• Stand (freight)
• Accessory shipment (freight or parcel
service, depending on size)
IMPORTANT! Specic shipping informaon is
displayed on packing list. Wait unl all shipments
are received before beginning installaon.
3.1.2 Moving the Crate
The PCNC mill is loaded on a standard pallet
and can be o-loaded from a truck with a
tailgate li and moved (on smooth surfaces)
using a hydraulic pallet jack to the installaon
locaon (see Figure 3.1).
Figure 3.1