EasyManua.ls Logo

Vaisala AWS310 - Page 41

Vaisala AWS310
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Using a screwdriver or similar, punch through a knockout directly below the system
grounding point, if not already done.
1 AC (mains) cable
2 System grounding point
3 Cable lug with hole Ø 6.2 mm (0.24 in)
4 Enclosure grounding cable
1 System grounding point
2 Cable connector
3 Cable conduit. Maximum cable Ø 21 mm (0.83 in).
Chapter 5 – Mast Installation
39

Table of Contents

Other manuals for Vaisala AWS310

Related product manuals