SHB WL34 * 2.0 1-7
Maintenance 1
Maintenance overview
Inspection schedules
Inspection after 30 operating hours
The maintenance and inspection personnel must have specialized
knowledge about the maintenance and inspection work on the machine.
► Observe the Operator’s Manual of the engine.
Ensuring correct machine function requires having the initial inspection
performed by an authorized service center after 30 operating hours,
however 3 months at the latest after putting the machine into operation.