EasyManua.ls Logo

Weinmann MEDUCORE Standard2 - Page 79

Weinmann MEDUCORE Standard2
396 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WM 68401 04/2021
MEDUCORE Standard
2
EN 79
4 Preparation
12. Connect the Pad connector of the paddles to the master cable.
When doing so, please note: The Pad connector must be
plugged in firmly.
13. Route the master cable in the groove between the device
compartment and the side compartment of the protective
transport bag.
14. Wind up the master cable and stow under the device.

Table of Contents

Related product manuals