3 - 2 MP7000 Scanner Scale Integrator Guide
Site Preparation
Ventilation and Spacing Requirements
The scanner/scale housing was designed to provide adequate space for ventilation and drainage for spills. 
Figure 
3-1 shows the drainage holes, under the platter, for possible spills that may occur when scanning/weighing items. 
Checkstand ventilation may be required to ensure the MP70XX temperature limits are not exceeded. If forced air 
ventilation is used, it must not pass through the MP70XX as this can produce an unstable weighing environment. 
The ambient air temperature inside the checkstand, adjacent to the device, must not exceed 104°F (40°C).
Figure 3-1    Drainage/Ventilation Holes
Service Access Requirements
The MP70XX was engineered to allow performance of all routine service and maintenance (including scale 
zeroing, and calibration) without removing the scanner from the counter.
Service must be performed by a Zebra Certified Repair Provider who has completed the Service Repair Training 
course, and (if applicable) the Scale Calibration Training course. For MP7001 and MP7002 scanner/scales, 
depending on the region of installation, a certified Weights & Measures technician is required to place the device in 
trade before using, and after certain repairs.
IMPORTANTThis guide does not encompass all factors related to worker safety and check stand design. It does offer 
a list of considerations which may be helpful in ensuring greater safety and productivity.
MP70XX Top View
(Drainage/Ventilation Holes on Both Sides)
MP70XX Side View
(Drainage/Ventilation Holes on Both Sides)