EasyManua.ls Logo

Zonge GDP-32 - Field Survey Program Screens

Default Icon
419 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ACCESSING PROGRAMS
Section 5, Page 5 May 2002
5.2 FIELD SURVEY PROGRAM SCREENS
Each Field Survey Program has four primary screens. Survey parameters are entered as
described below or described by the specific Field Survey Program Section.
Press
Enter
to move to the next screen or
Escape
to return to the previous screen.
Screen 1 - Initial Program Screen
Accepts the initial survey information.
Screen 2 - Operator Information Screen
Accepts semi-permanent survey information.
Screen 3 - Channel Parameters Screen
Accepts Channel parameters as outlined in each Field Survey Program.
Screen 4 - Data Acquisition Screen
Displays the primary survey settings and accepts the final survey parameters.
Calibrations, System Checks or Set Gains tools are also accessed from the Data Acquisition
Screen.
Other parameters that can be changed or input in this screen:
Transmitter and Receiver designations
N-Spacing
Frequency
Number of cycles to average
Current input
SP Buckout – F11
Contact Resistance – F12

Table of Contents

Other manuals for Zonge GDP-32

Related product manuals