EasyManua.ls Logo

Abbott Diagnostics Aeroset - Page 348

Default Icon
456 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODULE 9: ICT™ UNIT
9-12 AEROSET
®
Customer Training Guide
94858-103 — July 2003
Procedure
The information for the following steps is found in the AEROSET
System Operations Manual.
Refer to Component Replacement in Section 9, Service and
Maintenance of the AEROSET System Operations Manual to perform
the following procedures:
1. ICT Module Removal - to remove the ICT Module from the ICT
Module.
2. ICT Probe Removal - to remove the ICT Probe from the ICT
Module.
CAUTION: Inspect the top and bottom port of the
ICT Module for the presence of a black seal. If
missing, verify that the seal is not stuck to the
tubing connector or probe. Verify that
connections are finger-tight. Replace or reseat the
seal if necessary.
3. Replace the ICT™ Probe and ICT Module.
CAUTION: Ensure that the probe and tubing
connector are screwed in finger-tight only. If they
are screwed in too tightly, the seal may twist and
block flow through the ICT Module.
Refer to Component Replacement in Section 9, Service and
Maintenance of the AEROSET System Operations Manual to perform
the following procedure.
4. ICT Probe Alignment procedure - to check the ICT probe position.
5. Select <RUN> in the Action Area of the Main Display.
6. Select the Calibration and QC after Calib options.
7. Select <Order> next to the Calibration option and ensure that only
Na
+
, K
+
, and Cl
-
are selected.
8. Select <OK> in the Order Assays for Calibration screen.
9. Load the controls and ICT serum calibrators.
10. Select <Start>.
11. When the calibration is complete, review the ASSAY STATUS
screen to ensure that the calibration completed with no errors and
that the controls were within the expected range.
!
!

Table of Contents