START UP and SHUTDOWN
AEROSET
®
Customer Training Guide 3-7
94858-103 — July 2003
START UP AND SHUTDOWN
The START UP and SHUTDOWN Procedures are performed daily. The
Operator can initiate the procedures upon request or the System can be
configured to perform START UP and SHUTDOWN procedures
automatically at a specified time of the day.
NOTE: Refer to Section 2, Installation Procedures and Special
Requirements of the AEROSET System Operations Manual
for details on configuring automatic START UP and
SHUTDOWN Procedures.
The following table lists the options available on the START UP
OPTIONS and SHUTDOWN OPTIONS screens.
Option Description Screen
1
Change Water in Bath START UP or
SHUTDOWN
2
Wash Cuvettes START UP or
SHUTDOWN
3
Fill with Dtg (not currently used) SHUTDOWN only
4
Wash Probes with
• Water
• 1% Alkaline Wash Solution
• 0.5% Acid Wash Solution
NOTE: The mixers are also
washed.
START UP or
SHUTDOWN
5
Wash ICT™ with
• ICT Cleaning Fluid
• ICT Reference Solution
START UP or
SHUTDOWN
6
Drain & Fill IRef Cup START UP or
SHUTDOWN
7
Flush Water Lines START UP only
8
Clear Database
•Cal, QC
•Patients
• All Records
• Cal, QC, QCAvg
•Patients, QCAvg
• All Rec, QCAvg
SHUTDOWN only
Point out that:
• #3 and #8 are SHUTDOWN
only
• #7 is START UP only