EasyManua.ls Logo

Abbott Diagnostics Aeroset - Page 390

Default Icon
456 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODULE 11: COMPONENT REPLACEMENT AND TROUBLESHOOTING
11-12 AEROSET
®
Customer Training Guide
94858-103 — July 2003
WAR NI NG : Power is still supplied to the refrigerated
compartments on the AEROSET System.
6. To completely Power OFF the System, turn the Main Circuit
Breaker Switch to the OFF position.
Rotary Power
Control Switch
Setting
Action
AUTO Once the Power OFF sequence is complete, the
power is automatically disconnected from the
Analyzer and System Control Center (SCC)
components without any further intervention by
the Operator. However, the Main Circuit Breaker
Switch remains ON unless the Operator manually
moves the switch to the OFF position.
ON Turn the switch to the OFF position to complete
the Power OFF sequence.

Table of Contents