Installing Trunk Cables Between Network Interface, Sneak Fuse Panel, and
System Cabinet
Connecting Trunk Pairs to the Switch Cabinet Using Concentrator
Cables
Connecting Trunk Pairs to the Switch Cabinet Using Jumper Wires To
Establish 3-Pair Modularity
Installing Coupled Bonding Conductor Grounding
Installing Cables Between Switch Cabinet and the Cross-Connect
Field
Installing Cables Between Cross-Connect Field and Auxiliary
Cabinet
STATION WIRING DESIGN
Description
Information Outlets
Station Cables
Closets
Site Locations
Satellite Locations
Station Circuit Distribution From Equipment Room
4-Pair Station Circuits
3-Pair to 4-Pair Station Circuit Distribution
Layout
Locating Information Outlets
Locating Satellites and Sites
Adapter Requirements
110-Type Hardware Requirements
Sizing 4-Pair Station Cables (DIW)
Sizing 25-Pair and Multiple 25-Pair Station Cables
3-Pair Station Cable Circuits
4-Pair Station Cable Circuits
STATION WIRING AND ASSOCIATED HARDWARE INSTALLATION
Installing the Station Cables
Installing 110-Type Hardware at Satellite Locations
Labeling
Installing 4-Pair Station Cables
Installing the Information Outlets
ADJUNCT POWERING
Adjunct Powering From the Equipment Room
3-86
3-91
3-91
3-94
3-94
3-95
3-95
3-95
3-95
3-96
3-97
3-97
3-99
3-100
3-100
3-102
3-108
3-108
3-108
3-108
3-108
3-108
3-108
3-108
3-109
3-109
3-109
3-112
3-112
3-115
3-115
3-116
3-116
-iii-