110-TYPE HARDWARE
110P-TYPE HARDWARE FRAME MOUNTING ORDERING INFORMATION
Code Number Description
1110A2
Apparatus Mounting Frame
1110C1
Cable Support Assembly
1110A1 End Dress Panel
2110A1 Top Dress Panel
2110B1 Bottom Dress Panel
Comcode
104 032 495
104 175 120
104 176 263
104 176 276
104 176 284
Installing the Cable Slack Managers
To install the cable slack managers, proceed as follows:
1.
2.
3.
Position the Z113A cable slack manager against the wall under the cross-connect
field, aligning the side of the manager with the first terminal block of the
Trunk/Auxiliary Field.
Position the next cable slack manager under the cross-connect field and alongside
the previously installed manager, insuring that tabs and interlocks align and snap
together.
Repeat step 2 until all cable slack managers are installed.
Note: Nine 1/4-inch (6.4-mm) diameter holes are provided in the cable slack manager
bases for earthquake mounting if required. Also, if the cable slack managers are
mounted on an uneven floor, shims may be required to keep the cable slack managers
level and insure proper fit of the covers. Holes are also provided in the sides of the
base for bolting the cable slack managers together. Bolts and shims must be locally
provided.
Labeling the Cross-Connect Field
Figure 3-31 shows graphic symbols used (instead of words) on labels for switch, cross-
connect, information outlets, and cables for the system. The labels are color-coded to
identify system wiring as follows:
Green–Leads to central office
Purple–Leads to switch ports
Yellow–Leads to auxiliary equipment and miscellaneous switch leads
Blue–Leads to information outlets
White–Leads from the cross-connect field to the satellite locations (3-pair).
3-50