Z100-TYPE HARDWARE
Installing Cable Slack Managers
To install the cable slack managers, proceed as follows:
1.
2.
3.
Position the first cable slack manager against the wall under the cross-connect
field aligning the side of the manager with the first module installed.
Position the next cable slack manager under the cross-connect field and alongside
the previously installed manager insuring that tabs and interlocks align and fit
together.
Repeat step 2 until all the cable slack managers are installed.
Note: Nine 1/4-inch (6.4-mm) diameter holes are provided in the cable slack
manager bases for earthquake mounting if required. Also, if the cable slack
managers are mounted on an uneven floor, shims may be required to keep the
cable slack managers level and insure proper fit of the covers. Holes are also
provided in the sides of the base for bolting the cable slack managers
together. Bolts and shims must be locally provided.