66-TYPE HARDWARE
TABLE 4-F. 66-Type Hardware Requirements
Station Range
66M150
Blocks 1-Pair 2-Pair
3-Pair 4-Pair
Required Wiring*
Wiring* Wiring
Wiring
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1-24
25-48
59-72
73-96
97-120
121-144
145-168
169-192
193-216
217-240
241-264
265-288
289-312
313-336
337-360
361-384
385-408
409-432
433-456
457-480
1-12
13-24
25-36
37-48
49-60
61-72
73-84
85-96
97-108
109-120
121-132
133-144
145-156
157-168
169-180
181-192
193-204
205-216
217-228
229-240
1-8
9-16
17-24
25-32
33-40
41-48
48-56
57-64
65-72
73-80
81-88
89-96
97-104
105-112
113-120
121-128
129-136
137-144
145-152
153-160
1-6
7-12
13-18
19-24
25-30
31-36
37-42
43-48
49-54
55-60
61-66
67-72
73-78
79-84
85-90
91-96
97-102
103-108
109-114
115-120
* 1- and 2-pair wiring is only possible for analog type sets
EQUIPMENT ROOM HARDWARE AND CABLING INSTALLATION
Hardware Installation
The procedures provided in this guide for installing hardware are written so that one system
technician can do the installation. Procedures are provided for the following:
●
●
●
●
Installing the Cross-Connect Field
Installing the Cable Slack Managers
Labeling the Cross-Connect Field.
Installing the Sneak Fuse Panels
Installing the Cross-Connect Field
The preferred cross-connect field location is directly behind the switch cabinet. The first
column of 66-type connecting blocks should be aligned with the left side of the switch cabinet
(see Figure 4-15). This arrangement allows for growth on the right side of the cross-connect
field.
4-33