Z100-TYPE HARDWARE
General
Figure 2-43 shows cable routing through the cable slack manager for a 1-cabinet installation.
Cables pass through the cable slack manager in either the cabinet or wall troughs or when
needed through the two center troughs.
Port cables should use the cabinet trough for the parallel runs. The station cables should
use the wall trough. The center troughs are used after the cabinet and wall troughs are
filled.
Figure 2-44 shows typical cable routing from the switch cabinet to the cross-connect field
and cable access panel.
Figure 2-43. Cable Routing Through Cable Slack Manager—1-Cabinet
Installation
2-62