Service Manual_AVA1_ENG-20220922_I 248
Insert the ball bearing in the new peeling pin and the E-ring with long-noise plier (only one edge of the
peeling pine).
Insert the new peeling pin to the sheet metal slit like below.
Insert the ball bearing to the sheet metal
Insert the ball bearing to the other side of the sheet metal and the E-ring with long-nose plier:
(Cautions) When the peeling pin is installed, do not scratch
the pin surface by rubbing to the sheet metal edge strongly.