272 FTBx-88000 Series
EtherSAM - Global
Subtests
Service Configuration Test verifies if the network configuration is
correct for each service before starting a long term test (Service
Performance Test). To test the network configuration, an L2CP
Handling test, a ramp test, and/or a burst test is/are executed for each
configured service.
Subtest Duration indicates the Service Configuration Test
duration based on the configured Services, L2CP Handling, Ramp,
and Burst settings.
L2CP Handling Test check box when selected (cleared by
default) verifies that L2CP frames are handled appropriately. Only
available with Dual Test Set. Not supported at 200/400G rate.
Once the test is started, the configured quantity of L2CP frames for
the service under test are transmitted at the configured frame rate.
The test validates that the frames are received or not at the
destination (remote unit). Then, based on the Expected L2CP
Handling of each L2CP frame, a verdict is assessed for the service,
per L2CP frame, and per direction.
The L2CP Handling test is performed when enabled for each
enabled service.