CHAPTER 51
PAGE 44
PAGE DATE: 21. March 2014
MAINTENANCE MANUAL EXTRA 300LT
18 Proceed with final curing at 60°C (140°F) for at least 15h
(refer to Chapter 51-70-02).
19 Repeat the procedure in case the flange bushing on the op-
posite side has to be re-bonded as well.
20 Reinstall the wing. Refer to Chapter 57-0-01.