DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 231
8-12-60 Replacement of the AC Inlet Fuse 2EA
8-12-61 Replacement of the UBE Board Set-T
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional
checks"
4-3-25 "Battery Pack functional checks"
4-3-26 "Battery Pack Extended functional checks"
(if the system has Battery Pack)
4-3-23 "4D option functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ Totus and is the answer not in the manual?

GE LOGIQ Totus Specifications

General IconGeneral
BrandGE
ModelLOGIQ Totus
CategoryMedical Equipment
LanguageEnglish

Related product manuals