GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
8 - 232 Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
8-12-62 Replacement of the COM EXPRESS MODULE, I5 CFL 16G, I5 CFL 16
8-12-63 Replacement of the GPU SET-T
8-12-64 Replacement of the UEPP-T
8-12-65 Replacement of the M.2 SSD 1TB
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"