EasyManuals Logo

GE LOGIQ Totus User Manual

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #559 background imageLoading...
Page #559 background image
GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 233
8-12-66 Replacement of the UMC-T
8-12-67 Replacement of the BATTERY, TYPE 2032 COIN, 3 VOLT, LITHIUM
8-12-68 Replacement of the UAC-T PWA
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-1 "Control panel adjustment and functional
checks"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-23 "4D option functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional
checks"
4-3-1 "Control panel adjustment and functional
checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ Totus and is the answer not in the manual?

GE LOGIQ Totus Specifications

General IconGeneral
BrandGE
ModelLOGIQ Totus
CategoryMedical Equipment
LanguageEnglish

Related product manuals