GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 233
8-12-66 Replacement of the UMC-T
8-12-67 Replacement of the BATTERY, TYPE 2032 COIN, 3 VOLT, LITHIUM
8-12-68 Replacement of the UAC-T PWA
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-1 "Control panel adjustment and functional
checks"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-23 "4D option functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional
checks"
4-3-1 "Control panel adjustment and functional
checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"