8-12-69 Replacement of the UCO-T Assy
8-12-70 Replacement of the Unity ACDC Assy
8-12-71 Replacement of the UHUB-T
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional
checks"
4-3-15 "CW Doppler mode functional checks"
4-3-1 "Control panel adjustment and functional
checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-25 "Battery Pack functional checks"
4-3-26 "Battery Pack Extended functional checks"
(if the system has Battery Pack)
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"