GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 239
8-12-85 Replacement of the BW printer Option Cable Set-U
8-12-86 Replacement of the ACDC Link Cable To UBE Cable
8-12-87 Replacement of the Battery Option Cable Set-U
8-12-88 Replacement of the U-DCWD Set
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
Print by BW Printer
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-25 "Battery Pack functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-14 "PW/CW Doppler mode functional checks"
4-3-15 "CW Doppler mode functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"