GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 243
8-12-99 Replacement of the UBE TO OPIO HUB D-SUB 15PIN Cable
8-12-100 Replacement of the OPIO PWA-T
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-11 "Color Mode functional checks"
4-3-14 "PW/CW Doppler mode functional checks"
4-3-1 "Control panel adjustment and functional
checks"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"