EasyManua.ls Logo

GE LOGIQ Totus

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
8 - 242 Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
8-12-96 Replacement of the UBE To Monitor HDMI Cable
8-12-97 Replacement of the UBE To OPIO Touch Panel HDMI Cable
8-12-98 Replacement of the UBE TO OPIO HUB USB 3.0 Cable
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-11 "Color Mode functional checks"
4-3-14 "PW/CW Doppler mode functional checks"
4-3-1 "Control panel adjustment and functional
checks"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-11 "Color Mode functional checks"
4-3-14 "PW/CW Doppler mode functional checks"
4-3-1 "Control panel adjustment and functional
checks"
4-2-4 "Power shut down"

Table of Contents

Related product manuals