GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline) 8 - 241
8-12-92 Replacement of the U-WIFI Module Assy
8-12-93 Replacement of the HDU 23.8 inch Monitor LOGIQ Exx
8-12-94 Replacement of the OPIO HUB To Monitor Power Cable
8-12-95 Replacement of the OPIO HUB To Monitor USB 2.0 Cable
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief
Script
4-2-3 "Power ON/Boot Up"
Equipment passed all required checks and is ready for
use.
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Functional Check Debrief Script
4-2-3 "Power ON/Boot Up"
Leakage Current measured at (record the value)
and meets allowable limits.
Equipment passed all required checks and is ready
for use.