GE HealthCare CONFIDENTIAL
Direction 5936427, Rev. 1 LOGIQ Totus Basic Service Manual
1 - 28 Section 1-7 - Lockout/Tagout (LOTO)
4.
Unscrew 3 screws to remove the Battery Cable Cover
Bracket.
5.
Disconnect Battery Power Cable and Battery Signal
Cable.
6.
Confirm that all of these steps have been completed to verify isolation.
Table 1-10 Disconnect Battery Power (Continued)
Step Corresponding Graphic