EasyManua.ls Logo

GE LOGIQworks - Periodic Maintenance Schedule; How Often Should Pms be Performed

GE LOGIQworks
420 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION 5184024-100, REVISION 5 LOGIQWORKS BASIC SERVICE MANUAL
Chapter 10 Quality Assurance 10-3
Section 10-3
Periodic Maintenance Schedule
10-3-1 How often should PMs be performed?
The Maintenance Task Schedule specifies how often your LOGIQworks should be serviced and what
items need attention. It is the customer’s responsibility to ensure the LOGIQworks periodic maintenance
is performed as scheduled in order to retain its high level of safety, dependability and performance. Your
GE Service Representative knows your LOGIQworks best and can provide competent, efficient service.
Please contact us for further information and to schedule GE Medical Systems Ultrasound to perform
this service for you.
The services and intervals shown in the maintenance schedule assumes that you use your
LOGIQworks for an average image review load.
If conditions exist which exceed typical usage and image review load, then it is recommended to
increase the periodic maintenance frequencies.
Table 10-2 Periodic Maintenance Schedule
Service at Indicated Time Daily Weekly Monthly Annually Notes
Inspect AC Mains Cable look for damages
Inspect Cables and Connectors
look for damages
Clean all outer casings
dry PC cleaner cloth
Clean Monitor screen
Use anti static alcoholic moist
cloth
Clean Mouse and Keyboard
Use anti static alcoholic moist
cloth
Calibrate Monitors
2 weekly
See to 6-2 for LCD monitors
To adjust calibration interval
see chapter 3-5-2-5
Removal of Log files is performed
automatically
See chapter 3-5-4-5 for
maintenance period of
connection service,
Chapter 3-5-6-5 for
maintenance period of
database service,
Chapter 3-5-8-4 for
maintenance period of the
print service.

Table of Contents

Related product manuals