2-6 Section 2-2 - General Console Requirements
2-2-2-1 Cooling (cont’d)
2-2-2-2 Lighting
Bright light is needed for system installation, updates and repairs. However, operator and patient
comfort may be optimized if the room light is subdued and indirect. Therefore a combination lighting
system (dim/bright) is recommended. Keep in mind that lighting controls and dimmers can be a source
of EMI which could degrade image quality. These controls should be selected to minimize possible
interference.
2-2-3 Time and Manpower Requirements
Site preparation takes time. Begin Pre-installation checks as soon as possible, if possible, six weeks
before delivery, to allow enough time to make any changes.
Table 2-11 LOGIQworks Optional Hardware
PART Modem
BTU/h 164
Power (W) 48 Total BTU/h
All x 164
Table 2-12 Average Installation Time
Description Average Installation
Time
Comments
Unpacking 15 minutes 1 person
Checking delivery 15 minutes 1 person
Installation of
LOGIQworks
1.0 hour 1 person
Check connectivity
and setup
15 minutes 1 person