EasyManua.ls Logo

GE LOGIQworks - CHAPTER 3 Installation; Overview; The Purpose of Chapter 3; Average Installation Time

GE LOGIQworks
420 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION 5184024-100, REVISION 5 LOGIQWORKS® BASIC SERVICE MANUAL
Chapter 3 Installation 3-1
Chapter 3
Installation
Section 3-1
Overview
3-1-1 The Purpose of Chapter 3
This chapter contains information NEEDED to install the UNIT, a procedure that describes how to
receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit and
external peripherals for electrical safety are included in this procedure.
3-1-2 Average Installation Time
For time and personnel estimates during the installation see: Section 2-2-3 "Time and Manpower
Requirements" on page 2-6.
Table 3-1 Contents in Chapter 3
Section Description Page Number
3-1
Overview
3-1
3-2
Receiving and Unpacking the Equipment
3-3
3-3
Preparing for Installation
3-22
3-4
Completing the Installation
3-25
3-5
Configuration
3-68
3-6
Software Upgrades
3-205

Table of Contents

Related product manuals