EasyManua.ls Logo

GW Instek GSP-9300 - Page 216

GW Instek GSP-9300
342 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GSP-9300 User Manual
214
6cm trace[F5]
For traces of approx. 6cm
4cm trace[F6]
For traces of approx. 4cm
None[F1]
No correction is used.
2m cable[F2]
For cables of approx. 2m
1.5m cable[F3]
For traces of approx. 1.5m
1m cable[F4]
For traces of approx. 1m
0.5m cable[F5]
For traces of approx. 0.5m
4. Press one of the limit standards to show the
limit line for a standard and to start pass/fail
testing.
EN5502B
Euro residential standard (3m)
FCC B
American residential standard (3m)
Pass/fail testing will also be performed on the
simulated emissions after each sweep, based on
the standard selected.
Pass:
, with green grid border.
Fail:
, with red grid border.
The alarm icon is shown at the bottom of
the display when a standard is selected.
Limit line

Table of Contents

Other manuals for GW Instek GSP-9300

Related product manuals