You can add shi for employees including seng shi period
(day, week, month) and the eecve aendance me. According
to the actual requirements, you can adding mulple metables in
one shi for employees, which requires them to check in and
check out for each metable.
Before You Start
Add a metable rst. See Add General Timetable for details.
Steps
1.
Click Time &
Aendance → Shi to enter shi sengs page.
2.
Click Add to enter Add Shi page.
3.
Enter the name for
shi.
4.
Select the shi period from the drop-down list.
5.
Select the added metable and click on the me bar to apply
the metable.
Figure 8-11 Add Shi
Note
You can select more than one metables. The start and end
work me and the valid check-in and out me in dierent me
tables can not be overlapped.
Figure 8-12 Add Mulple Timetables
6.
Click Save.
The added shi lists on the le panel of the page. At most 64
shis can be added.
86