EasyManua.ls Logo

IBM 7226 - Page 60

IBM 7226
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Review the information concerning each drive status LED, then turn on the
power to the 7226 Storage Enclosure and watch for the following:
v The 7226 Storage Enclosure power-on LED comes on and stays on.
v The drive status LEDs blink for up to 60 seconds and go out, indicating that
the Power-On Self Test (POST) has completed successfully.
36 7226 Storage Device Enclosure Setup, Operator and Service Guide

Table of Contents

Other manuals for IBM 7226

Related product manuals